play_arrow

keyboard_arrow_right

Listeners:

Top listeners:

skip_previous play_arrow skip_next
00:00 00:00
playlist_play chevron_left
chevron_left
  • play_arrow

    DLFM 106.9 Home of Legends

Featured

Prempeh I International Airport in Kumasi Begins Full Operations

todayJuly 2, 2024 54

Background
share close

Prempeh I International Airport in Kumasi officially started operations on Monday, July 1, 2024. The Ghana Airports Limited (GACL) announced this in a statement.

Before opening fully, the airport conducted subsystem operations and simulation exercises to ensure everything was working smoothly. For the past three days, three flights have been operating to test the systems.

Both local and international flights are now landing successfully at the airport. The GACL emphasized their commitment to providing world-class airport facilities and operations.

This is Ghana’s second international airport, aiming to position the country as a preferred aviation hub in West Africa.

The airport features a presidential hub, terminals with an annual capacity for 800,000 passengers, boarding gates, medical facilities, 16 immigration booths, staff offices, a forex bureau, and arrival facilities.

Written by: DLFM

Rate it

Post comments (0)

Leave a reply

Your email address will not be published. Required fields are marked *

0%